This 25,600 S.F. project was an ADA compliance upgrade of a school auditorium including a new sound booth, ticket booth and concession booth. Upon investigation, it was determined that the existing auditorium floor in the seating area was sloping at angles greater than allowed by accessibility requirements. We worked with the DSA to achieve the proper seating for the disabled without tearing out the large areas of the floor. The scope of work also included upgrades to all restrooms with path of travel improvements for disabled access.
Reseda High School Auditorium
Schools